Home -
  • Ngā pārongo mā ngā Kaitono. Information for Candidates
    • How to become a candidate
    • Constituencies
    • Candidate Safety
    • Official Information Requests
  • Te Kaunihera me ngā kaikaunihera. Council and councillors
    • Greater Wellington
    • Being a councillor
  • Te Rohe-Pōti Māori me te Pōti. Māori Constituency and Poll
    • Māori Constituency
    • Māori Constituency poll information
  • Tūtaki mai ki ngā kaitono. Meet the Candidates
    • Kāpiti Coast General candidates
    • Pōneke/Wellington General candidates
    • Porirua-Tawa General candidates
    • Te Awa Kairangi ki Tai / Lower Hutt General candidates
    • Te Awa Kairangi ki Uta / Upper Hutt General candidates
    • Wairarapa General candidates
    • Te Upoko o te Ika a Māui Māori candidates
  • Rēhita mai ki te pōti. Enrol and vote
Home -
    • Ngā pārongo mā ngā Kaitono/ Information for Candidates
    • How to become a candidate
    • Constituencies
    • Candidate Safety
    • Official Information Requests
    • Te Kaunihera me ngā kaikaunihera/ Council and councillors
    • Greater Wellington
    • Being a councillor
    • Te Rohe-Pōti Māori me te Pōti/ Māori Constituency and Poll
    • Māori Constituency
    • Māori Constituency poll information
    • Tūtaki mai ki ngā kaitono/ Meet the Candidates
    • Kāpiti Coast General candidates
    • Pōneke/Wellington General candidates
    • Porirua-Tawa General candidates
    • Te Awa Kairangi ki Tai / Lower Hutt General candidates
    • Te Awa Kairangi ki Uta / Upper Hutt General candidates
    • Wairarapa General candidates
    • Te Upoko o te Ika a Māui Māori candidates
  • Rēhita mai ki te pōti Enrol and vote
  • Section 32 report: Air quality management for the Proposed Natural Resources Plan for the Wellington Region

    Download now (PDF 983 KB)

    alarm Published 01 Jul 2015
  • Technical report: Conjunctive water management recommendations for the Hutt Valley.

    Download now (PDF 3.3 MB)

    alarm Published 01 Jul 2015
  • Technical Report: Allocation recommendations for the Wellington region: Technical report to support the proposed Natural Resources Plan

    Download now (PDF 2.2 MB)

    alarm Published 01 Jul 2015
  • Technical Note 9: WPTM 2013 Validation preview

    Technical Note 9: WPTM 2013 Validation

    This technical note documents the validation of the Wellington Public Transport Model (WPTM) as part of the 2013 update of the model. The validation process ensures that the WPTM is…

    Technical Note 9: WPTM 2013 Validation preview

    Download now (PDF 3.8 MB)

    alarm Published 01 Jul 2015
  • Technical Report: Allocation recommendations for the Wellington region: Technical report to support the proposed Natural Resources Plan

    Download now (PDF 2.2 MB)

    alarm Published 01 Jul 2015
  • Technical Note 9: WPTM 2013 Validation. WTSM update 2013 preview

    Technical Note 9: WPTM 2013 Validation. WTSM update 2013

    Technical Note 9: WPTM 2013 Validation. WTSM update 2013 preview

    Download now (PDF 3.8 MB)

    alarm Published 01 Jul 2015
  • Section 32 report: Soil conservation for the Proposed Natural Resources Plan for the Wellington Region

    Download now (PDF 898 KB)

    alarm Published 01 Jul 2015
  • Wairarapa Flow Regimes - Economic impact assessment of draft Plan changes  preview

    Wairarapa Flow Regimes - Economic impact assessment of draft Plan changes 

    Link to report prepared in July 2015 for GWRC by LWP as part of the draft Natural Resources Plan process

    Wairarapa Flow Regimes - Economic impact assessment of draft Plan changes  preview

    Download now (PDF 665 KB)

    alarm Published 01 Jul 2015
  • Flood Protection: Option Flexibility and its Value  preview

    Flood Protection: Option Flexibility and its Value

    This paper looks at the value of pursuing flood protection options that are flexible, rather than adopting a single solution that cannot be adapted to deal with changing and unpredictable external…

    Flood Protection: Option Flexibility and its Value  preview

    Download now (PDF 642 KB)

    alarm Published 01 Jul 2015
  • Guidelines for Floodplain Management Planning preview

    Guidelines for Floodplain Management Planning

    This document provides guidance on the floodplain management planning process, and on the preparation and production of Floodplain Management Plans. The purposes of the guidelines are to apply consistent principles…

    Guidelines for Floodplain Management Planning preview

    Download now (PDF 1.3 MB)

    alarm Published 30 Jun 2015
  • Prev
  • 1
  • ...
  • 753
  • 754
  • 755
  • 756
  • 757
  • ...
  • 2347
  • Next
Archive - Library
  • September 2025
  • August 2025
  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • 2024 - 2015
  • 2014 - 2005
  • 2004 - 1995
  • 1994 - 1970

Legal 

  • About this site open_in_new
  • Copyright open_in_new
  • Privacy statement open_in_new
Greater Wellington Regional Council Logo, Te Pane Matua Taiao
Copyright © 2025 Greater Wellington Regional Council
New Zealand Government Logo